1991.04 Altai cashmere was established
1991.06 Construction of industrial building started.
1993.04 Equipment to wash wool and cashmere was installed.
1993.11 Began washing the first cashmere.
1995.04 Assembled 4 dehairing machines that were made in England and put them into operation.
1995.11 Started exporting dehaired cashmere to England.
1999.09 Assembled 4 dehairning machines that were made in China and put them into operation.
1999.12 The company's Managing Director was awarded as "The Top Businessman of Mongolia".
2002.06 Industrial buildings for knitting, spinning and dyeing put into operation.
2002.11 The equipment for a knitting workshop was assembled and put it into operation, started producing knitted products.
2004.08 A 1780sq.m, 3-floor building for office purpose was put into operation.
2005.12 Selected as the year's top taxpayer organization.
2006 Awarded 2006 Best traditional costume style award
2007.6 Establishment of new two facilities for spinning factory and knitting factory
2007.7 Installation of 3 fully computerized Stoll knitting machines 2007.8 Honored by the Ministry of Trade and Industry of Mongolia for valuable contribution to the development of Mongolia |